一、施工设备žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、机具:ZM4-500型电动油泵2-4台、YCJ26型千斤顶2台、YCM150-200型千斤顶4YC60A-200型千斤顶1-2台、YH型压花机1台、GYJ型挤压机台、BW160型压浆机1台、限位板6件、工具锚4件、高压油管、千斤顶支撑。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、工具:钢尺、手锤、扳手、φ6cm水管žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
3、张拉记录表、退锚剂žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
二、机具检验及千斤顶鉴定:经监理工程师认可的有资质的计量部门žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
三、张拉方法žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、纵向张拉:纵向张拉使用预应力锚具为YM15-7群锚,YM15G-7连接器,每束钢绞线为7根,根据图纸要求,采用一端或两端对称整体张拉。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、竖向张拉:竖向使预应力锚具为JLM32精轧螺纹钢和φ32精轧螺纹钢,根据图纸要求采用两端张拉。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
四、张拉预应力计算及钢绞线伸长值žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
根据图纸要求:žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、纵向预应力使用YM15-7群锚,YM15G-7连接器与φ157φ5)标准强度Ryb=1860MPa钢绞线配套张拉,张拉控制应力为1367.1KN,钢绞线的伸长值为分段计算。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、竖向预应力使用JLM32精轧螺纹钢锚具和Φ32精轧螺纹钢配套张拉,张拉控制应力为žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
KN
,精轧螺纹钢的伸长值以施工图为准。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
五、钢绞线下料、轧花、P型锚挤压与编束žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、切割下料应用高速切割砂轮žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、P型挤压成型žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
3、钢绞线编束时不得互相纠缠。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
六、预应力孔道žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、波纹管预埋前应检查是否有孔洞,如有孔洞应及时处理或修补。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、波纹管接头要牢固,防止浇注砼时脱节或进浆造成堵塞。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
3、排气管要预埋好。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
七、张拉前的准备žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、预制梁的砼强度达到设计强度要求,žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、清除锚垫板止口面的水泥,žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
3、清除垫板及波纹管内的水泥及堵塞物,检查压浆孔道及压浆孔的畅通,žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
4、清除预应力筋的水泥、锈斑及污物。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
八、锚具的安装žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
夹片装好锚环、夹片、夹片用水管套筒打紧,用力要一致、均匀;žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
精轧螺纹钢装好螺母,保证张拉端有足够的长度进行张拉。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
九、张拉žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
张拉前,将电动油泵连同千斤顶在空负荷运行两遍,以检查机具的运行良好,然后按照下面顺序进行张拉操作:žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
安装žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
0žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
初应力(测量伸长值)    控制应力(测量伸长值)žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
十、技术要求žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、测量的延伸量与计算延伸量误差应控制在±6%以内,否则要检查原因或重新张拉。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、张拉后,预应力筋回缩值不超过5mmžà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
3、每束钢绞线滑丝、断丝不超过1根,每个断面断丝只和不超过该断面钢丝总数的1%žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
十一、封锚、压浆žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
张拉完毕后及时封锚,以便压浆。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、压浆水灰比为0.4~0.451žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、压浆前,孔道要用水清洗,并检查孔道畅通。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
3、压浆方法可采用两次压浆或采用高压压浆。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
4、压浆水泥标号R425žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
5、水泥浆如需加外加剂,需经监理工程师同意。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
十二、安全注意事项žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1、张拉时,施工人员应该在千斤顶两侧操作施工;žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
2、电控开关要接地;žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
3、千斤顶及油泵有漏油现象,就立即停止;žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
4、张拉时,要均匀、平稳进油和千斤顶伸出。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k

附件: 预应力共工程.pdf

附件: 预应力张拉与孔道压浆施工方案.doc
zhbin1858 - 2010/11/21 21:42:00
下了学习,非常感谢!!!žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
tulou - 2010/11/21 22:15:00
谢谢,下载学习了žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
sxpm616 - 2010/11/22 5:27:00
感谢楼主提供的宝贵资料,下载学习学习žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
tw87878787 - 2010/11/22 10:00:00
学习学习谢谢žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
chshping - 2010/11/26 23:58:00
zhe ge zi liao dui wo hen you yongžà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
让风知道 - 2011/3/12 11:41:00
下了,学习!žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
dali668 - 2011/3/12 14:12:00
下载了,谢谢。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
张恒52088 - 2011/3/12 15:53:00
学习下。žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
让风知道 - 2011/3/23 10:15:00
学习!žà–ÜP³Jngµbbs.3c3t.comUÍHsç-k
1
查看完整版本: 下载: 预应力工程 及 预应力张拉与孔道压浆施工方案