预应力张拉与孔道压浆施工方案àÜP³Jngµbbs.3c3t.comUÃHsç-k
àÜP³Jngµbbs.3c3t.comUÃHsç-kàÜP³Jngµbbs.3c3t.comUÃHsç-k
àÜP³Jngµbbs.3c3t.comUÃHsç-k一、施工设备:àÜP³Jngµbbs.3c3t.comUÃHsç-k1、机具:ZM4-500型电动油泵2-4台、YCJ26型千斤顶2台、YCM150-200型千斤顶4台YC60A-200型千斤顶1-2台、YH型压花机1台、GYJ型挤压机台、BW160型压浆机1台、限位板6件、工具锚4件、高压油管、千斤顶支撑。àÜP³Jngµbbs.3c3t.comUÃHsç-k2、工具:钢尺、手锤、扳手、φ6cm水管àÜP³Jngµbbs.3c3t.comUÃHsç-k3、张拉记录表、退锚剂àÜP³Jngµbbs.3c3t.comUÃHsç-k二、机具检验及千斤顶鉴定:经监理工程师认可的有资质的计量部门àÜP³Jngµbbs.3c3t.comUÃHsç-k三、张拉方法àÜP³Jngµbbs.3c3t.comUÃHsç-k1、纵向张拉:纵向张拉使用预应力锚具为YM15-7群锚,YM15G-7连接器,每束钢绞线为7根,根据图纸要求,采用一端或两端对称整体张拉。àÜP³Jngµbbs.3c3t.comUÃHsç-k2、竖向张拉:竖向使预应力锚具为JLM32精轧螺纹钢和φ32精轧螺纹钢,根据图纸要求采用两端张拉。àÜP³Jngµbbs.3c3t.comUÃHsç-k四、张拉预应力计算及钢绞线伸长值àÜP³Jngµbbs.3c3t.comUÃHsç-k根据图纸要求:àÜP³Jngµbbs.3c3t.comUÃHsç-k1、纵向预应力使用YM15-7群锚,YM15G-7连接器与φ15(7φ5)标准强度Ryb=1860MPa钢绞线配套张拉,张拉控制应力为1367.1KN,钢绞线的伸长值为分段计算。àÜP³Jngµbbs.3c3t.comUÃHsç-k2、竖向预应力使用JLM32精轧螺纹钢锚具和Φ32精轧螺纹钢配套张拉,张拉控制应力为àÜP³Jngµbbs.3c3t.comUÃHsç-k
KN,精轧螺纹钢的伸长值以施工图为准。àÜP³Jngµbbs.3c3t.comUÃHsç-k五、钢绞线下料、轧花、P型锚挤压与编束àÜP³Jngµbbs.3c3t.comUÃHsç-k1、切割下料应用高速切割砂轮àÜP³Jngµbbs.3c3t.comUÃHsç-k2、P型挤压成型àÜP³Jngµbbs.3c3t.comUÃHsç-k3、钢绞线编束时不得互相纠缠。àÜP³Jngµbbs.3c3t.comUÃHsç-k六、预应力孔道:àÜP³Jngµbbs.3c3t.comUÃHsç-k1、波纹管预埋前应检查是否有孔洞,如有孔洞应及时处理或修补。àÜP³Jngµbbs.3c3t.comUÃHsç-k2、波纹管接头要牢固,防止浇注砼时脱节或进浆造成堵塞。àÜP³Jngµbbs.3c3t.comUÃHsç-k3、排气管要预埋好。àÜP³Jngµbbs.3c3t.comUÃHsç-k七、张拉前的准备àÜP³Jngµbbs.3c3t.comUÃHsç-k1、预制梁的砼强度达到设计强度要求,àÜP³Jngµbbs.3c3t.comUÃHsç-k2、清除锚垫板止口面的水泥,àÜP³Jngµbbs.3c3t.comUÃHsç-k3、清除垫板及波纹管内的水泥及堵塞物,检查压浆孔道及压浆孔的畅通,àÜP³Jngµbbs.3c3t.comUÃHsç-k4、清除预应力筋的水泥、锈斑及污物。àÜP³Jngµbbs.3c3t.comUÃHsç-k八、锚具的安装àÜP³Jngµbbs.3c3t.comUÃHsç-k夹片装好锚环、夹片、夹片用水管套筒打紧,用力要一致、均匀;àÜP³Jngµbbs.3c3t.comUÃHsç-k精轧螺纹钢装好螺母,保证张拉端有足够的长度进行张拉。àÜP³Jngµbbs.3c3t.comUÃHsç-k九、张拉àÜP³Jngµbbs.3c3t.comUÃHsç-k张拉前,将电动油泵连同千斤顶在空负荷运行两遍,以检查机具的运行良好,然后按照下面顺序进行张拉操作:àÜP³Jngµbbs.3c3t.comUÃHsç-k安装àÜP³Jngµbbs.3c3t.comUÃHsç-k
0àÜP³Jngµbbs.3c3t.comUÃHsç-k
初应力(测量伸长值) 控制应力(测量伸长值)àÜP³Jngµbbs.3c3t.comUÃHsç-kàÜP³Jngµbbs.3c3t.comUÃHsç-k十、技术要求àÜP³Jngµbbs.3c3t.comUÃHsç-k1、测量的延伸量与计算延伸量误差应控制在±6%以内,否则要检查原因或重新张拉。àÜP³Jngµbbs.3c3t.comUÃHsç-k2、张拉后,预应力筋回缩值不超过5mm。àÜP³Jngµbbs.3c3t.comUÃHsç-k3、每束钢绞线滑丝、断丝不超过1根,每个断面断丝只和不超过该断面钢丝总数的1%。àÜP³Jngµbbs.3c3t.comUÃHsç-k十一、封锚、压浆àÜP³Jngµbbs.3c3t.comUÃHsç-k张拉完毕后及时封锚,以便压浆。àÜP³Jngµbbs.3c3t.comUÃHsç-k1、压浆水灰比为0.4~0.45∶1。àÜP³Jngµbbs.3c3t.comUÃHsç-k2、压浆前,孔道要用水清洗,并检查孔道畅通。àÜP³Jngµbbs.3c3t.comUÃHsç-k3、压浆方法可采用两次压浆或采用高压压浆。àÜP³Jngµbbs.3c3t.comUÃHsç-k4、压浆水泥标号R425àÜP³Jngµbbs.3c3t.comUÃHsç-k5、水泥浆如需加外加剂,需经监理工程师同意。àÜP³Jngµbbs.3c3t.comUÃHsç-k十二、安全注意事项àÜP³Jngµbbs.3c3t.comUÃHsç-k1、张拉时,施工人员应该在千斤顶两侧操作施工;àÜP³Jngµbbs.3c3t.comUÃHsç-k2、电控开关要接地;àÜP³Jngµbbs.3c3t.comUÃHsç-k3、千斤顶及油泵有漏油现象,就立即停止;àÜP³Jngµbbs.3c3t.comUÃHsç-k4、张拉时,要均匀、平稳进油和千斤顶伸出。àÜP³Jngµbbs.3c3t.comUÃHsç-k附件:
预应力共工程.pdf 附件:
预应力张拉与孔道压浆施工方案.doc
zhbin1858 - 2010/11/21 21:42:00
下了学习,非常感谢!!!àÜP³Jngµbbs.3c3t.comUÃHsç-k
tulou - 2010/11/21 22:15:00
谢谢,下载学习了àÜP³Jngµbbs.3c3t.comUÃHsç-k
sxpm616 - 2010/11/22 5:27:00
感谢楼主提供的宝贵资料,下载学习学习àÜP³Jngµbbs.3c3t.comUÃHsç-k
tw87878787 - 2010/11/22 10:00:00
学习学习谢谢àÜP³Jngµbbs.3c3t.comUÃHsç-k
chshping - 2010/11/26 23:58:00
zhe ge zi liao dui wo hen you yongàÜP³Jngµbbs.3c3t.comUÃHsç-k
让风知道 - 2011/3/12 11:41:00
下了,学习!àÜP³Jngµbbs.3c3t.comUÃHsç-k
dali668 - 2011/3/12 14:12:00
下载了,谢谢。àÜP³Jngµbbs.3c3t.comUÃHsç-k
张恒52088 - 2011/3/12 15:53:00
学习下。àÜP³Jngµbbs.3c3t.comUÃHsç-k
让风知道 - 2011/3/23 10:15:00
学习!àÜP³Jngµbbs.3c3t.comUÃHsç-k